Monday, February 22, 2010

Week 3 Renovation (22nd - 26th Feb 2010)

Day 1 & Day 2
After back from CNY, our renovation work continue! Electrical and air con trunking to be installed on this two days and citigas installation as well.


Electrical work and citigas piping installation


Remove the Panasonic air con from previous owner


Air con trunking, insulation and new air con bracket

For air con trunking, we requested ½ inch insulation - Insurflex. You can request for Armaflex but do take note trunking size will be increase as it's thicker. As for copper wire we took 22swg and drainage pipe 16mm thick. The reason why hubby took leave to be there, is to make sure everything delivered in order. As once installation done, you will not be able to spot the details.

Note:
Please make sure terms and services to be noted in invoice for future reference and try to be there during the air con installation.


To know more knowledge on air con, please refer to http://singapore-aircon.blogspot.com/

Day 3 & Day 4
Air con installation work


Mitsubishi Starmex System 4


Trunking for living hall, MBR and Study Room


Wide & Long Air Flow for our Living Hall :)


Install the new compressor and filling in more gas


Cover up our new air con to avoid dust during the renovation

Day 5
Install water piping


MBR & common bathroom hot & cold water piping


Tiles crack spotted in common bathroom, will get our ID to fix it no matter what!


The hot & cold shower piping fixed wrongly in our common bathroom. It should be fix at the other side of the wall instead of the entrance. Going to meet Mr.K next week and get him to change it!


Hubby sealing up our new air con again, to make sure no 'allowances' available for the dust to sneak in :P


50% done for our sanctuary home :)

Sunday, February 7, 2010

07.02.2010 - Electrical Point Layout

Met up our ID Mr.K to discuss our electrical power point layout. After 2 weeks of our renovation started, now then we gather have discussion with him IN our house! What a busy man! But at least he keep track of our on going renovation with the contractor for the past 2 weeks. Our electrical/air con work will start right after Chinese New Year, before the carpentry work on March.

Mr.K 'drawing' everywhere, stated all power point layout


The 'shadow' of Mr.K, and hubby


After discussed all the power point, we fixed a date for the electrical, air con and city gas work on 24th Feb 2010. Gonna be SUPER busy right after CNY, and hubby has to busy coordinating all schedule with the electrician, air con and city gas arrangement. Due to Mr.K met us so late, we still haven't get quotation from any electrician yet, same as air con :-( Now we stuck with the tight schedule timing, BLAME our ID who met us so LATE!!!!!!!!!!

*Please remember to get your ID/contractor to confirm power point with you as early as possible so that you could start finding for all the quote

Manage to confirm our bed frame color today as well, since we always have the hard time to meet up with Mr.K, we drag him to Ackerman & Smith to choose our bed frame color, before we let him off for the day!


Since we at Kaki Bukit, hubby suggested go to XZQT. Actually we had dropped by this place before, spotted 1 dining table, very designs - but too pricey! -_-" Still considering of the table, going to send Mr.K photo to see does it match our themes.


Ackerman & Smith
No. 1 Kaki Bukit Road 1 #01-23 Enterprise One Building
Singapore 415934

Tel : 6749 5755

http://www.ackerman.sg/


XZQT Studio
1 Kaki Bukit Road 1
#01-19/20 Enterprise 1
Singapore 415934

Tel: 67490813

http://www.xzqt.com.sg

Still hunting for dining table......... :S

Wednesday, February 3, 2010

Week 2 Renovation (1st - 5th Feb 2010)

Day 1 & Day 2
Both bathroom and kitchen tiles UP! Can't really see the big difference now, big mess everywhere!

MBR Floor Tiles


Common Bathroom and Kitchen Tiles


New rubbish cube

Day 3
MBR shower kerb is build! And our 2 pieces of granite to allocate our shampoo :P


Kitchen skirting and cabinet base is done as well


Rubbish cube installed!


And the washing machine base :)


Day 4
Common bathroom floor tiles done and both bathroom new windows grill installed as well!


Master bathroom - build false wall for the 2 granites


Day 5
Tiles work finally completed!


Here's done Week 2! Next week our contractor going to stop work from 9th Feb and start work on 1st March for Chinese New Year...
 

❤ Our Sanctuary Home Sweet Home ❤ Copyright © 2009 Cookiez is Designed by Ipietoon for Free Blogger Template